killswtch's Home Automation and Media Projects
This is the story of my attempts at integrating various technologies into a 3-bed semi, constructing as much of the hardware and electronics as possible myself.
Tuesday 27 November 2007, 6:44 PM
My 19" Rack - Phase 6 - Adding the side panels
3mm MDF was used for the side panels. Originally it was intended that the panels be much thicker and stronger to allow direct mounting of equipment (e.g. an LCD or Plasma display) to the sides, but this would have added significant weight to what was already quite a heavy structure.






